Installation Operations

Operational practice that reduces callbacks and protects your certification.

Operational discipline protects margin and certification simultaneously. These guides cover the practices that reduce callbacks and withstand audit.

Survey

Room-by-room heat loss calculation, honest assessment of emitter sizing, and a clear record of the design assumptions. If the system underperforms later, the design record is what distinguishes a defensible installation from an indefensible one.

Commissioning and handover

Commission properly and record it. Hand over to the customer in a way that leaves them able to operate the system, because a customer who runs a heat pump like a gas boiler will be dissatisfied with a technically correct installation.

Records

Installations may be selected for audit, and the property owner is expected to allow access. Keep quotes, invoices showing the upfront grant deduction, commissioning data and handover documentation retrievable.

Retrospective applications

Applying after commissioning is possible within 120 days where properly made, but Ofgem notes it carries additional risk, because applying after installation does not guarantee an award. If you take that route, be clear with yourself about who carries the risk.

Articles in Installation Operations

Articles for this topic are in preparation. In the meantime, the hub index lists what is available.